Little used Proton OnSite C20 electrolytic hydrogen generation system made in 2018.
The system was installed and tested but never put into operation due to owner dropping the project.
Key information includes:
- Capacity: 20 Nm3/h, 760 SCFH, 359 SLPM, 43.3 kg/24 hours.
- Purity: 99.9998%, water vapour <2ppm, -72 degrees Celsius, (-98 degrees Fahrenheit), N2<2ppm, O2<1ppm.
- Power consumption: 66.7 kWh/kg
- Turndown range: 0-100%
OEM specification sheet available on demand.
Note that Proton OnSite is now part of Nel ASA since being acquired in 2017.