Overview
This 700 HP Cleaver Brooks CB 200-700 Steam Boiler has been comprehensively refurbished to deliver like-new performance with modern controls and components. This 4-pass dry-back design operates on natural gas or No. 2 oil with a 150 PSI design pressure. Manufactured in 1995, this unit has undergone complete reconditioning including cleaning, testing, new controls, and comes with a 1-year parts warranty on controls. Located in South Carolina and ready to ship immediately.
Design and Performance
Horsepower: 700 HP
Model: CB 200-700
Year Built: 1995
Design: 4-pass dry-back
Working Pressure: 150 PSI
Fuel Type: Dual Fuel - Natural Gas / No. 2 Oil
Emissions: Standard NOx
Condition: Fully Refurbished
Location: South Carolina (FOB Shipping Point)
Complete Refurbishment Details
Cleaning & Preparation
Fireside cleaned
Waterside cleaned
Exterior cleaned and painted
New fireside and waterside gaskets installed
Testing & Certification
Pressure vessel hydrostatically tested
Tubes hydrostatically tested
Trim piping tested
Blowdown piping and valves tested
PP Certified
New Components Installed
New blowdown valves
New Honeywell 7800L Flame Safeguard Controls
New Honeywell High Limit (manual reset)
New Operating Limit controls
New Modulating Limit steam pressure controls
Inspection & Verification
Complete electrical inspection
Complete mechanical inspection
Defective components identified and replaced
Guaranteed to pass hydrostatic test at startup
Key Specifications
Boiler Type: 4-pass dry-back firetube
Capacity: 700 HP
Design Pressure: 150 PSI
Fuel Options: Natural Gas and No. 2 Oil
Control System: New Honeywell 7800L
Safety Controls: New high/operating/modulating limits
Certification: PP Certified
Warranty & Guarantees
Controls Warranty: 1-year parts replacement on controls
Pressure Vessel: Guaranteed good condition
Hydrostatic Test: Guaranteed to pass at startup
Inspection: Welcome before purchase
Ideal Applications
Large Manufacturing Facilities
Industrial Process Steam
Hospital Central Plants
University Campus Systems
Large Commercial Buildings
Food Processing Plants
Pharmaceutical Manufacturing
Chemical Processing
District Steam Systems
Any facility requiring 700 HP steam
Benefits
Fully refurbished to like-new condition
New Honeywell controls ensure reliability
Dual fuel flexibility for cost management
700 HP capacity for large operations
All new gaskets prevent leaks
Pressure tested throughout
1-year control warranty provides peace of mind
Ready to ship saves time
Inspection welcome builds confidence
Professional refurbishment extends service life
Purchase Information
Location: South Carolina (FOB)
Shipping: Ready to ship immediately
Loading: Onto truck provided by buyer
Payment Terms: Full payment before loading
Taxes: Not included - buyer responsibility
Availability: Subject to prior sale
Inspection: Welcome and encouraged