Your Cart
You don't have any items in your cart.

USED 2004 DAEWOO DMV-3016D

Overview
Manufacturer:
DAEWOO
Model:
DMV-3016D
Year:
2004
Description

2004 Daewoo DMV-3016D Vertical Machining Center. Features a Fanuc oi-MB controls, 32.3" X, 16.1" Y, and 20.1" Z travel, 15 HP power, 8000 RPM, and a CAT 40 taper. Includes 20 automatic tool changers on a 3-axis 39.4" x 17.7" table.

Specifications
X32.3"820.42 mm
Y16.1"408.94 mm
Z20.1"510.54 mm
Power15 hp11.2 kW
RPM8,000 RPM8,000 RPM
# ATC2020
TaperCAT 40CAT 40
Table-W17.7"449.58 mm
Table-L39.4"1,000.8 mm
# Axis33
ControlCNCCNC

DAEWOO DMV 3016D CNC MACHINING CENTER

S/N AV4E0354 Year: 2004

PRELIMINARY SPECIFICATIONS
Control.............................Fanuc oi-MB
X-Axis Travel.......................32.3”(820mm)
Y-Axis Travel.......................16.1”(410mm)
Z-Axis Travel.......................20.1”(510mm)
Table Size..........................39.4”x 17.7”(1000 x 450mm)
Max Table Load......................600 kg
RPM.................................8,000
HP..................................15
ATC.................................20 Tool
Tool Standard.......................CAT 40
Voltage.............................208V-240V
Phase...............................3
Frequency...........................60 Hz
Power...............................35 KVA
Positional Accuracy.................+/-0.005mm/Full Stroke
Repeatability.......................+/-0.002mm

EQUIPMENT & FEATURES
Box way construction on X, Y, & Z axes.
Flood coolant.
Base coolant.
Automatic lubrication system.
Rigid tapping.
Leveling pads.
Numerous canned cycles, part scaling, rotation, & mirror imaging.
Engraving program.
RS232C I/O device.
Clamping kit.

Specifications are deemed accurate, however, subject to verification or prior sale.

All exchange units/returns must be shipped within 30 days. All exchange units/returns must be shipped using DDP terms - Grinders Clearing House, Inc. dba GCH Machinery, is not responsible for any customs formalities or shipping costs.

If Grinders Clearing House, Inc. dba GCH Machinery does not receive exchange/core unit back within 30 days, GCH will invoice FULL replacement cost (OUTRIGHT Cost) to customer.

Loading...
Loading...
Loading...