Denray Dust Funnel for Airborne Dust at Work Cast Off Area, 5" Intake Hose, 1500 CFM required
NEW
Price for one 42" wide section
With hinges attached, a plywood bridge allows lifting up to any router (see below)
1,500CFM required per section (single unit)
A triple unit (10.5') requires 3,000 - 3,500 CFM
Width is limited by how many units you can put together
Each unit requires a 5" intake hose
Additional option: For a powerful backdraft suction of airborne dust from the router, 10,000 CFM is
required for 3 sections, with an 8" inlet on each section
Contact us for more information and a quote!