USED EATON SVX025A1-5A4N1
Overview
Specs
Horsepower: 30 hp
Voltage: 600 volts
Phase: 3-phase
Amps: 34 amps
Cabinet Type: Eaton Freedom 2100 Series
**Fits 2100 MCC Frame
Input
Rating: 3-ph, 525-690V, 50/60 Hz, 34A
Output
Rating: 3-ph, 0-690V, 0-320 Hz, 27/34A
Power: 25CT/30VT
VFD
Model:SVX025A1-5A4N1
Breaker
Make: Eaton Cutler Hammer
Amperage: 60 amps
Voltage: 600 volts
Poles: 3
Trip Model: LFD3070R
Control Relay x 2
Make: Eaton
Model: XTRE10B22
Transformer
Model: 5642-14-120-00
Primary volts: 600v
Secondary volts: 120v
Reactor
Make: Rex
Model: 34C5LF
Explore More Used Equipment Listings on Equipt
Browse related Used Switchgears, Switchgear & Circuit Protection, Control & Automation Equipment, and Robotics & Automation equipment, including EATON machines for sale on Equipt.
Used Equipment for Sale in British Columbia, Canada
Find Used Switchgears, Switchgear & Circuit Protection, Control & Automation Equipment, and EATON equipment for sale in British Columbia, Canada, with related local Robotics & Automation searches.
Used Equipment for Sale in Canada
Browse Used Switchgears, Switchgear & Circuit Protection, Control & Automation Equipment, and EATON equipment for sale across Canada, including related Robotics & Automation inventory paths.
Sell Your Used Equipment
Find dedicated pages to sell used Switchgears, Switchgear & Circuit Protection, Control & Automation Equipment, Robotics & Automation, and EATON equipment on Equipt.

