Your Cart
You don't have any items in your cart.
Used

USED 2022 HARBEN ET180

Minnesota, United States
Asking Price
USD $79,500.00
1 available
500Listings|1Follower
Overview
Combination Sewer Cleaners

JETTER / SEWER CLEANER TRAILER

109 ENGINE HOURS
4000 psi / 18 gpm
Harben “run dry” high pressure diaphragm pump
750 gallon capacity
180 degree hydraulic & pivoting hose reel
Reel speed control valve
Jump jet (optional)
7 channel wireless remote control (optional)
Emission compliant diesel engine
Double axle trailer
Powder coat paint finish
When it comes to plumbing jobs, you never quite know what challenges you’ll face. One day it might be tree roots causing a blockage, and the next day it could be a clog made from sludge and grease. These varying problems require powerful solutions, and that’s where trailer jetters and towable sewer jetting equipment come into play. They are essential tools designed to clear out unwanted obstructions with ease, ensuring that everything flows smoothly.

When you need to maximize your working time, the Harben ET180 trailer jetter is the model for you. It shares all the great features of the E180 with the benefit of a 750-gallon water capacity.

Harben “run dry” high-pressure diaphragm pump

750-gallon capacity
180-degree hydraulic & pivoting hose reel
Reel speed control valve
Jump jet (optional)
7 channel wireless remote control
Emission compliant diesel engine
Twin axle trailer
Powder coat paint finish
It is suitable for cleaning drains and sewers from 1? to 18” in diameter. The country’s original “high pressure-low flow” sewer jetting unit, this Harben trailer still holds a dominant place in the market.

At the heart of the ET180 trailer jetter is our own Harben ‘P’ type high-pressure diaphragm pump. It produces up to 4000 psi and up to 18 gpm and is covered by a 5-year warranty. Peace of mind is guaranteed when you buy a Harben trailer jetter. Check out the unique advantages of the Harben in the video below.

This equipment is not just about power; it’s about versatility. Trailer jetters can handle a range of obstructions, whether it’s descaling pipes or cutting through roots. They are perfect for domestic and light commercial situations, and the ET180 has enough jetting power to drive our complete range of nozzle accessories with ease.

Used in numerous applications from residential and commercial drains to factories, farms, and food processing plants, the ET180 can clear blockages, descale, and root cut, making it the ideal choice for various plumbing scenarios.

Why Durability is Important for Drain Jetting Equipment

Cost-Effectiveness: Investing in durable equipment saves money in the long run. High-quality, long-lasting tools reduce the frequency and cost of replacements and repairs.
Reliability: Durable drain jetters are less likely to fail during crucial moments, ensuring your workflow is smooth and efficient. Cheap, low-quality jetters might work initially but break down when you need them the most, causing costly delays. Harben jetters can run dry without damage.
Performance: High durability often correlates with high performance. Sturdy equipment can handle the tougher clogs and more strenuous tasks that flimsier jetters simply cannot.
Safety: Durable jetters are designed to withstand rigorous use and harsh environments, which enhances safety. Subpar equipment might lead to potential injuries.
Professionalism: Using reliable and durable equipment reflects professionalism. When customers see you using high-quality tools from reputable brands like Harben, it builds their confidence in your services.

Specs

Color: BLUE
Brand: JETTER TRAILER

Loading...
Loading...
Loading...