Attached is the info on the Precipitator and Recovery Boiler. The Recovery output was 377,500 lbs/ hr.
Combustion Engineering Boiler built in 1967 and rebuilt in 1985. Shutdown in 2001
Boiler Design Pressure 1020 PSIG with an operating pressure of 915 PSIG
Environmental Elements Precipitator installed in 2000 and shutdown in 2001
| Dimensions | 377,500 PPH | 377,500 PPH |